Download APC Smart-UPS VT 400 System information
Transcript
Maintenance – Parts Replacement Install the battery module in the lowest available bay (four across in 523 mm/(20 in) UPS versions, two across in 352 mm/(14 in) UPS versions). Position the battery unit to slide in between the grooves and push it completely into the UPS to ensure connection. Note: If a problem is reported, ensure that the modules in question are correctly installed. If the problem persists, see the section Troubleshooting. Note: Allow for a 24-hour recharging period of the batteries after system start-up. 34 Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation 990-2282C-001