Download APC Smart-UPS VT 400 System information

Transcript
Maintenance – Parts Replacement
 Install the battery module in the lowest available bay (four across in 523 mm/(20 in) UPS versions,
two across in 352 mm/(14 in) UPS versions).
 Position the battery unit to slide in between the grooves and push it completely into the UPS to
ensure connection.
Note: If a problem is reported, ensure that the modules in question are correctly installed. If
the problem persists, see the section Troubleshooting.
Note: Allow for a 24-hour recharging period of the batteries after system start-up.
34
Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation
990-2282C-001