Download Verilink M1-3 User Manual
Transcript
Quick Set-Up Installation Mount the shelf within an air-conditioned room on a standard 19 or 23” rack. Refer to the AS3000: The Basics manual for detailed module installation instructions and precautions. CAUTION Verilink components contain static-sensitive circuits. Before unpacking the equipment, ensure you are wearing an anti-static wrist strap connected to frame ground to prevent damage to circuits from electrostatic discharge. Module Installation Install the M1-3 module components as follows: 1. Install the rear connector module, CIM 3113 into the back of the MLS shelf, slot 6. 2. Install the M1-3 module into the front of the shelf in slot 6. 3. Connect the T3 cables to the ports on the CIM 3113. The M1-3 module verifies self test (LEDs flash red, then green, in rapid succession). Log In Connect a Craft cable to the port labelled LOCAL on the front of the SCM module. Connect the other end of the Craft cable to your PC or terminal. If using a PC, start a session in a terminal program. 1. Set your terminal parameters to: • 19.2 kbit/s • 8 data bits • No parity • One stop bit • No flow control 2. Press ENTER and the pSH+> prompt displays. 3. Type “craft” (lowercase). The prompt Your Password displays. 4. Initially there is no password, press ENTER. The SCM Main Menu displays. 2-2 Verilink M1-3 User Manual