Download Gesa
Transcript
Gesa CUSSoftware Administrator and Operator Manual issue I revision 0- 12/09/2001 e 44ol 91 2.2.10 MANUAL TRANSFER OF SCHEDULES TO ISS. User profile CUS Mission Planner Connection VT200 Start time 15:00 UTC Duration a few minutes Frequency Daily References Doc. R-1, Chapter 7.2.1 Related tables and files Scope The Schedule Transfer is normally handled by the CUS Automatic Event Scheduler. This procedure is only used if it is necessary to manually transfer the schedules (ie. AES is not running). However, the error checking (STEP 5) of this procedure must be performed by the operators on a daily basis. Ensure that CUS (generated and) transferred to ISS the Acquisition and Processing Schedules for all involved stations and the Distribution Schedules for ISS (LBR FDPs) or for NSC (SAR FDPs). ( Input (Describes the input (e.g. file) required by the procedure.) Initial conditions NOTE: BEGIN THIS PROCEDURE ONLY AFTER SCHEDULE GENERATION CUS OP-MAN PROCEDURE #4.2.4 Sequence of operations NOTE: THIS IS THE SECOND PROCEDURE IN THE DAILY GENERATION, TRANSFER AND FAXING OF SCHEDULES 1) Connect to CUS and Logan with usemame XXOPOOOl,Password .... 2) Enter the command: • HOME • START_PROC • 29 • y This will start a detached process called SCGP_XTAS_xxxx where xxxx is a number - write it down. • NOTE:If this process does not start up correctly, then enter: • CLEAN_PROC and answer YES to any questions and repeat this step again. 3) Enter: