Download Metering Protocol Appendicies
Transcript
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 1035 13 METER APPROVAL TESTING 13.1 General Requirement 13.2 Meter Failure Definition 13.3 Meter Design Rejection Criteria 13.4 Test Setup 13.5 Functional Test (No Load Test) 13.6 Accuracy Test 13.7 Line Voltage Variation Test 13.8 Momentary Power Loss 13.9 Power Failure Backup System Test 13.10 Brownout and Extended Low Voltage Test 13.11 Effect of Power Failure Backup System Voltage Variation on Clock Accuracy 13.12 Effect of Temperature Variation on Clock Accuracy 13.13 Temperature Cycle Test 13.14 Humidity Cycle Test 13.15 Insulation Withstand Test 13.16 Standard Waveform Surge Withstand Test 13.17 Fast Transient Waveform Surge Withstand Test 13.18 Powerline Surge Voltage and Current Test 13.19 Electrostatic Susceptibility Test 13.20 Visual Inspection 13.21 Shipping Test Issued by: N. Beth Emery, General Counsel and Vice President Issued on: June 1, 1998 Effective: March 31, 1998