Download Metering Protocol Appendicies
Transcript
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III E6 Original Sheet No. 1083 • Enter the load losses in Watts from the test data. • Enter the impedance from the test data. • Enter the Exciting current from the test data. • If the maximum available kVa from the transformer bank is more than the rated kVa, this value can be entered manually. An example may be for a triple rated transformer that has fans with a rating which is more than the base kVa. This value only affects the percent use calculation. • Enter the line type for each type of line to be compensated. • Enter the resistance in ohms per mile of each type of line to be compensated. • Enter the total length in miles of each type of line to be compensated. Reference Materials The following additional references may be referred to for assistance when calculating the correction factors referred to in this Appendix. • Handbook For Electricity Metering, Ninth Edition. Edison Electric Institute. Washington, D.C. • Eastern Specialty Company Bulletin No. 63. • American National Standard Institute. Test Code for Distribution, Power and Regulating Transformers. • System Loss Compensation, Schlumberger Industries, Quantum Multifunction Meter Hardware Instruction Manual 1610, November 1993. • Transformer Loss Calculation Method, Process System Manual, Appendix E. Issued by: N. Beth Emery, General Counsel and Vice President Issued on: June 1, 1998 Effective: March 31, 1998