Download Setting up and using - Agilent Technologies

Transcript
238
Chapter 10: Setting VPrep pipette task parameters
VWorks User Guide
Setting Dry Tips pipette task parameters
About this topic
This topic describes how to set the Dry Tips task parameters for a
Velocity11 VPrep.
Dry Tips pipette task
defined
The Dry Tips task is used with a tip dryer on a VPrep with a fixed-tip
head to dry the pipette tips.
There are two phases to drying:
❑ Initial
Rapidly raises the temperature from ambient to a temperature
suitable for drying.
❑ Final
Maintains a suitable drying temperature.
The goal when setting Dry Tips task parameters is to raise the
temperature quickly for a short time and then apply less heat to dry the
tips.
Procedure
To set Dry Tips task parameters:
1. Complete the following:
Parameters
Description
Initial heat
Percentage of the maximum heat.
Initial heat time
Time for which to apply the initial heat.
Final heat
Percentage of the maximum heat.
Final heat time
Time for which to apply the final heat, starting when
the initial heat time ends.
Related information
For more information about...
See...
Creating a pipette process
“Adding and configuring a pipette
process task” on page 226
Creating protocol basics
“Workflow for creating a protocol” on
page 163
Setting pipette task parameters
“Setting pipette task parameters” on
page 173