Download Service Manual

Transcript
10-04
Funnel Replacement
Part 2. Removing a Funnel
2-1.
Using pair of needle-nose pliers, gently remove each gas tube where it meets its connector
on the funnel bracket.
2-2.
Locate the two screws at the top of the funnel bracket. Loosen the two screws until the
bracket slips free.
Bracket Screws
Figure 2. Three Tubes and Two Bracket Screws on Funnel
Part 3. Replacing a Funnel
Perform Part 2 in reverse.
3-1.
Attach the funnel bracket with the two screws.
3-2.
Replace the gas tubes onto their proper barb fittings: Clear tube = GAE; White tube = O2;
and Black tube = TMCTS.
3-3.
On the left side of the outside of the workchamber, connect circular connector J1402.
Part 4. Setting the Temperatures on the Heater Board
See Service Procedure 10-07
Page 4 of 4
Revision B, 3/97