Download Service Manual
Transcript
10-04 Funnel Replacement Part 2. Removing a Funnel 2-1. Using pair of needle-nose pliers, gently remove each gas tube where it meets its connector on the funnel bracket. 2-2. Locate the two screws at the top of the funnel bracket. Loosen the two screws until the bracket slips free. Bracket Screws Figure 2. Three Tubes and Two Bracket Screws on Funnel Part 3. Replacing a Funnel Perform Part 2 in reverse. 3-1. Attach the funnel bracket with the two screws. 3-2. Replace the gas tubes onto their proper barb fittings: Clear tube = GAE; White tube = O2; and Black tube = TMCTS. 3-3. On the left side of the outside of the workchamber, connect circular connector J1402. Part 4. Setting the Temperatures on the Heater Board See Service Procedure 10-07 Page 4 of 4 Revision B, 3/97
Related documents
Notes on Troubleshooting LC/MS Contamination
Ultra Systems User Guide.book
User Manual - David Hoyle
C Vu Volume 1 Issue 2 PDF
2094-IN005 - Rockwell Automation
BAG100-SD, DeviceNet Interface for the Bayard Alpert Gauge
NSFL user manual - U. of M. WWW server
Philips Printer Driver v 7 Release Documentation
Owner`s Manual
Dynatech MP-5000 Service manual
Service Manual - Infiniti Medical
Service Manual - Propaq Encore Vital Signs Monitor